Image from Google Jackets

WASH Project : fifty month contract summary / prepared by James E. Beverly.

By: Beverly, James EContributor(s): Water and Sanitation for Health ProjectMaterial type: TextTextSeries: WASH progress report ; no. 8Publication details: Arlington, Va. : WASH, 1984. Description: 81 pSubject(s): Water supply | Sanitary engineering | Developing countriesNLM classification: WA 675
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Books Books WHO HQ
BORROWABLE-COLL-STACKS
WA 675 84BE (Browse shelf(Opens below)) 1 Available 00039067

4

There are no comments on this title.

to post a comment.
Share
Implemented & Customized by: OpenLX

Powered by Koha